AET Member Maintenance Instr.

Posted by Aditya Birla Group on its own career page, for Vadodara.

Live: we never show roles older than 5 days, and we alert you only to roles under 24 hours old.

About this role

Company
Aditya Birla Group
Where
Waghodia, Vadodara, Gujarat, India
Field
Manufacturing and production
Level
Senior
Experience asked
5 to 12 years
Kind of work
Employee
Must have
Plant or site posting
Posted

In short

Leads maintenance of PV ribbon production equipment, ensuring reliability, safety compliance and preventive maintenance.

How to apply

  1. Read the description below and check what the role asks for.
  2. Apply on the company's own career page with the button above.
  3. Set up NinjaApply once with your resume to hear about roles like this in their first day.

Apply early: the first hour after a role opens is the best time, and the longer you wait, the more your chances can fall.

The job description

From Aditya Birla Group's own posting, as it was when we read it.

  • Job Purpose:
  • Deliver P&B with Production and maintenance targets by ensuring efficiency in processes and equipment reliability with safety and statutory compliances
  • Drive effective daily maintenance management and foster a culture of continuous improvement by implementing best practices and engineering of excellence in mechanical operation and Maintenance.
  • Dimensions:

Business Workforce Number

MG:630

Staff: 410

Worker: 900

Contract: 5000

Unit Workforce Number

MG: 51

Staff: 69

Contract: 250

Function Workforce Number

MG: 6

Staff: 32

Contract: 0

Department Workforce Number

MG: 6

Staff: 32

Contract: 0

Other Quantitative and Important Parameters for the job: Budgets/ Volumes/No. of Products/Geography/ Markets/ Customers or any other parameter

Overall Production Capacity :

PV Ribbon - 1500 MT/Annum

Products :

PV Round Wire: 0.21- 0.33 MM

PV Flat Ribbon: Width: 3- 8 MM Thickness: 0.15- 0.45 MM

Customers : Solar Panel Manufacturer

Critical Equipment : 12 nos.

No of Confined Space : 0 nos.

No of Haz Waste Management : 2 nos.

Power Consumption : 5000 Kwh/Day

No. of statutory Compliances : 4 nos.

No of Pressure Vessels : 8 nos.

Annual Shutdown Expenditure : Not required .

  • Job Context & Major Challenges:

Job Context:

  • Support installation, commissioning, and stabilization of mechanical equipment in the PV ribbon production line.
  • Ensure high equipment reliability, availability, and performance to enable uninterrupted production.
  • Execute preventive and predictive maintenance practices to minimize breakdowns and improve equipment life.
  • Coordinate with operations, quality, and engineering teams for smooth functioning of production lines.
  • Support development of maintenance SOPs, checklists, and best practices for long-term reliability.
  • Assist in development of local vendor base and management of critical spares inventory.
  • Ensure compliance with safety, statutory, and environmental requirements in all mechanical activities.

Major Challenges:

  • Ensuring reliability and performance of new and specialized PV ribbon manufacturing equipment.
  • Managing frequent breakdowns and stabilization issues during initial project phase.
  • Limited availability of skilled manpower for specialized mechanical systems.
  • Maintain MTBF, MTBR within lead time
  • Maintaining optimum inventory of critical spares while controlling costs.
  • Supporting fast-track project execution and meeting tight timelines for commissioning and stabilization.
  • Review of key Daily Performance Indicators (DPIs), Root Cause Analysis of any unfavorable deviations in last 24 hours
  • Define Model areas / machines, devoid of unwanted items and make abnormality Identification (8 types) & redressal as a continuous process in all DMTs. (5S & Kaizen)
  • Address Total hazards and unsafe behaviours (as per HAZOP, HIRA metrics) to meet plant / corporate safety norms & guidelines through projects/action plans
  • Obtain PM plan / schedule for area from Maintenance Planner and ensure adherence to PM implementation leading to reduction in breakdowns
  • Progress on condition appraisal for all sub equipment and assemblies
  • Identify the process deviations for all critical processes and take actions for improvement.
  • Key Result Areas

Key Result Areas

Supporting Actions

  • Safety & Workplace Management
  • Drive strategic / large scale improvement initiatives under the guidance of PBU Head and ensure all statutory requirements in the Area are met with focus on air and water pollution control, for hazardous wastes and effluents.
  • Implement procedures & plans, for compliance with statutory, regulatory & environmental norms and HIL standards for Occupational Health, safety & environment.
  • Identify health hazards that arise out of occupational, design & human risk factors and implement programs to comply with statutory requirements & hazard mitigation.
  • Drive Kaizen and other improvement initiatives for greater sustainability of operations.
  • Maintain workplace in order with respect to all Sub-areas (Level of 5-S).
  • Comply with safety standards & procedures (work permit system, storage and handling hazardous material, etc.) for accident prevention in the Area.
  • Ensure complete implementation of LOTOTO (Look-Out, Tag-Out & Try-Out) guidelines for personnel safety.

Daily Work Management

  • Drive flawless daily work by undertaking following:
  • Implementation of DMTs excellence standards across the Area
  • Achievement of monthly, quarterly and annual P&B targets of the assigned Are

[...]

  • Monitor equipment performance and report abnormalities.

Meet and exceed internal & external customer expectations, adhere with service level agreements (SLAs), and implement action plans based on ICSI, customer feedback & surveys.

  • Min BE / BTech
  • Experience > 5 Years in relevant field
  • Leadership

Experience: 5 to 12 years